301 Florida Ave NE Mixed-Use Mid-Rise

Concrete & Structural Takeoff In Washington, DC

A developer bidding a six-story mixed-use building on Florida Avenue NE needed a concrete and structural quantity takeoff before the design development set was even fully stamped. Rebar schedules were still being revised, and the estimating window closed in days, not weeks.

NEDES worked directly from the DD structural set, flagging open rebar callouts and building the takeoff around the sections that were locked. The client received foundation, slab, and structural concrete quantities broken out by pour, letting their bid team price the job with confidence while the drawings finished catching up.

301 Florida Ave NE mixed-use mid-rise building in Washington DC, priced with a takeoff by NEDES Estimating