The buildout covers approximately 6,800 square feet inside a historic Cady’s Alley shell, where existing structural cavities constrain both ceiling depth and wall thickness for new mechanical and electrical runs. A Class 2 estimate carries an accuracy range of −5% to +10%, per AACE International’s cost estimate classification system (2020). This range applied here because the reflected ceiling plan and existing conditions survey together formed a fully coordinated document set for takeoff.
NEDES logged 310 individual line items across ductwork, conduit runs, panel locations, and fixture counts. Each mechanical and electrical routing path was measured against the existing conditions survey rather than assumed from a standard new-construction layout, since a historic shell rarely offers the cavity depth a typical retail buildout allows. The reflected ceiling plan set the fixture and duct placement baseline, and the existing conditions survey confirmed which cavities could actually carry new runs.
An MEP takeoff built on a standard layout assumption risks pricing conduit and duct paths the shell cannot physically accommodate. NEDES avoids this by cross-checking every routing path against the field-verified existing conditions survey before quantities are finalized, so the contractor’s bid reflects the building as it exists, not as a typical buildout would assume.