Earthwork & Sitework Takeoff For A Commercial Building Pad

951 N Central Ave, BAC Building Sitework

The BAC Building’s civil set showed cut-and-fill numbers that hadn’t been reconciled with the geotechnical report. The contractor was pricing the earthwork package from the civil engineer’s raw grading plan alone.

NEDES combined the grading plan and geotechnical data, recalculated cut, fill, and haul-off volumes, and delivered an earthwork takeoff matched to actual soil conditions rather than assumed ones. The contractor’s bid reflected the real cost of moving dirt on that site, not a plan-only estimate.