Project 8 in the NEDES Estimating portfolio, delivered with a CSI-based takeoff and cost estimate

Provided detailed takeoff and cost estimate of water proofing details at the development to the contractor.
• Division – 1 General Requirements
• Division -7 Moisture and Thermal Protection.